8613564568558

A triumphant march through the harsh winter! SEMW’s soft soil treatment equipment sets off for Singapore, helping to build a world-class aviation hub!

Set sail! Set sail! Set sail!
Let the world see the power of SEMW manufacturing!

This winter, it’s not just the warm sunshine that’s dazzling.

Also, China Power Construction Vibration and SEMW

A blazing light igniting on the global infrastructure stage!

Recently, SEMW deployed multiple large-scale soft soil treatment equipment.

Neatly lined up, setting sail for Singapore!

Heading to the Singapore Changi Airport Terminal 5 project.

With its strong capabilities, we are helping to build a national-level aviation hub!

The convoy, majestic as a dragon, was fully prepared and ready to go.

Even in the depths of winter, its majestic power shines even brighter!

Despite the cold winter, the SEMW production workshop and commissioning site were bustling with activity. To ensure the timely and high-quality delivery of multiple large soft soil treatment equipment units, the company organized a dedicated team to strictly control the entire process, from technical coordination and process assembly to overall testing. Overcoming challenges such as tight deadlines and complex processes, they ultimately ensured the equipment was launched in optimal condition. This enthusiasm and professionalism, forged in the cold season, vividly embodies SEMW’s philosophy of “meticulous manufacturing, reliable win-win.”

 A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

On the afternoon of December 29, at the SEMW equipment manufacturing base, multiple sets of soft soil treatment equipment for the Singapore Changi Airport T5 terminal project completed all commissioning and inspection and were officially delivered for shipment. This batch of equipment will travel across the sea to participate in the foundation reinforcement construction of a key project for Singapore’s international aviation hub. Chinese equipment and construction capabilities will once again take center stage on major international projects, laying a solid foundation for the new wing of the “Lion City”.

A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

Before the shipping ceremony, a delegation from China Power Construction Zhenchong Co., Ltd., accompanied by Gong Xiugang, General Manager of SEMW, visited the company’s modern assembly workshop and inspected the rigorous and efficient assembly lines and the series of products on display. The delegation from China Power Construction Zhenchong highly praised the company’s perfect assembly process and strict quality control system.

A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

At 3:00 PM, accompanied by rousing music, the leaders from both sides moved to the shipping ceremony area. SEMW Deputy General Manager Huang Hui presided over the ceremony and solemnly introduced the main leaders and guests present.

 

First, Mr. Gong Xiugang, General Manager of SEMW , delivered a welcome speech . Mr. Gong stated: “Today, we are here to witness a milestone in the cooperation between SEMW and China Power Construction Zhenchong – the official delivery and shipment of soft soil treatment equipment for the Singapore Changi Airport Terminal 5 project. On behalf of SEMW , I would like to express my heartfelt gratitudA triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singaporee to China Power Construction Zhenchong for their long-term trust and support, and pay high tribute to the teams from both sides who have worked hard for the project. Changi Airport Terminal 5 is a future-oriented mega-project and a model of Belt and Road cooperation. The soft soil treatment equipment shipped today is the result of our deep collaboration. We specifically developed a high-torque, large-diameter deep cement-soil mixing pile drilling rig, an energy-saving and environmentally friendly electro-hydraulic crawler pile frame, and an automated grouting system for this project. Through an intelligent construction management system, we have formed a highly efficient overall solution for soft soil treatment, laying a solid foundation for the terminal construction. The deep integration of China Power Construction Zhenchong’s professional experience and SEMW ‘s equipment technology has overcome industry challenges and created a new pattern of cooperation. The shipment of this equipment is a testament to our achievements and a new starting point.” These technologies will help create “deeply stable, green, and efficient” projects, showcasing the strength of Chinese manufacturing to the world. In the future, SEMW will continue to focus on technology and customers, fully supporting project construction, providing solid guarantees, and working hand in hand with China Power Construction Zhenchong to create high-quality projects.

Following this, Hao Yong, General Manager of China Power Construction Zhenchong, delivered a speech . Mr. Hao stated: “Today, we gather in Shanghai to witness an important moment—the official shipment of the soft soil treatment equipment customized for the Singapore Changi Airport Terminal 5 project! Here, I would like to express my heartfelt gratitude to our long-term partner SEMW for their trust and support! I also extend my highest respect to all colleagues who have worked diligently on the equipment’s research and development, production, and delivery!”

A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

The soft soil foundation treatment equipment shipped this time is not only sophisticated equipment, but also “steel warriors” carrying a mission. They will be heading to Singapore to participate in the construction of Terminal 5 at Changi Airport. This project is a significant milestone in global aviation infrastructure, and we feel a profound sense of responsibility and honor in participating in it. Our company is undertaking the foundation and pile foundation engineering for the MS section of the core underground network of Terminal 5, including ultra-large diameter deep cement mixing piles that will extend 35 meters underground, directly impacting the safety and stability of the superstructure. The equipment shipped today is core equipment tailor-made for this purpose, embodying SEMW ‘s manufacturing processes and our commitment to quality and safety, and will greatly enhance on-site construction capabilities and efficiency. This cooperation is not just about equipment delivery, but also a transfer of trust and responsibility. We will work closely with the general contractor and all partners, using a professional team, sophisticated equipment, and rigorous management to create a high-quality project and showcase the spirit of Chinese builders.

A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

Following the opening remarks, the exciting product delivery segment commenced . General Manager Gong Xiugang solemnly handed over the “Golden Key” symbolizing ownership and technical commitment to the equipment to General Manager Hao Yong . General Manager Hao Yong then passed the “Golden Key” to Huang Hongqing, Deputy Chief Engineer of China Power Construction Zhenchong Company and General Manager of the Singapore Company. Thunderous applause filled the air, marking the official launch of several “national heavyweights” embarking on their mission. Next, a lion dance performance, symbolizing good fortune, ignited the atmosphere. Amidst the resounding drums and gongs, the majestic lions offered auspicious blessings, signifying smooth sailing and great success for the project.

A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

At 4:00 PM sharp, with the joint command of “Depart now!” from both sides’ leaders, the transport convoy carrying multiple soft soil treatment equipment
slowly departed from the departure area amidst the sound of firecrackers, officially embarking on its journey to Singapore. Thunderous applause erupted as everyone watched the convoy depart, wishing these “steel giants” great success in a foreign land.

 

The convoy sounded its horn and set off, traversing the winter chill towards a distant port. This shipment is not merely a physical relocation of equipment, but also a significant demonstration of SEMW ‘s brand strength and equipment competitiveness. Moving forward, SEMW will continue to uphold its innovation-driven and quality-focused development philosophy, working with global partners, including China Power Construction Zhenchong, to contribute more solid ” SEMW Intelligent Manufacturing” strength to global infrastructure construction , jointly embarking on a new journey of high-quality development!

 A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

 

Introduction to Soft Soil Treatment Equipment

As a globally significant infrastructure project, Singapore Changi Airport Terminal 5 places extremely high demands on the stability and durability of its foundation treatment. The DSM500 deep mixing plant delivered this time is a specialized soft soil foundation treatment device developed specifically for deep cement mixing. It enables efficient and precise injection and mixing of cement slurry in soft soil strata, significantly improving the foundation’s bearing capacity and stability through cement hardening and chemical reaction with the soil. This equipment features high construction efficiency, minimal environmental impact, and excellent reinforcement effects, and is widely used in soft soil foundation reinforcement projects such as artificial islands, wharves, and tunnels, perfectly meeting the high-standard foundation treatment requirements of the Changi Airport project.

 

Energy-saving and environmentally friendly electro-hydraulic crawler piling rig , also shipped concurrently , is a new generation of high-performance piling equipment independently developed by SEMW based on the assimilation and absorption of advanced international technologies. It boasts strong operational stability, wide adaptability to various working conditions, and outstanding construction efficiency, meeting the requirements for pile foundation construction under various complex geological conditions and providing reliable underground support for the main structure of the terminal building. The combined application of these two pieces of equipment will significantly improve the overall construction efficiency and project quality of the soft soil treatment.

 A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

The equipment is equipped with an intelligent construction management system, a digital command center tailored for deep mixing plants, which comprehensively upgrades traditional construction operations into a smart process that is monitorable, traceable, and finely adjustable. This system not only remotely controls the drilling rig and slurry valves and adjusts construction parameters in real time, but also provides integrated intelligent management of the back-end slurry preparation and supply process, achieving fully automated control from batching and mixing to delivery. During construction, all key data such as depth, rotation speed, flow rate, and inclination angle are recorded and calculated in real time, forming a complete and transparent digital construction archive. This effectively ensures the accuracy, uniformity, and traceability of each mixing pile, ushering in a new era of precision and information-based quality control for foundation treatment.

A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore

The MZ30 mixing system, a key supporting component, adopts a modular, assembled design, forming a highly efficient and automated slurry production system. This system integrates multiple functions, including mixing and metering, silo storage, water supply, slurry storage and delivery, and intelligent electrical control. It can accurately receive digital instructions from the construction management system, achieving automatic slurry metering, preparation, and delivery. Through fully automated control of construction parameters and real-time monitoring and early warning of the pile formation process, this equipment effectively ensures the uniformity, impermeability, and overall strength of the piles, meeting the consistent requirements for foundation treatment quality in the Changi Airport project. Furthermore, its cement silos can be flexibly adjusted in capacity according to project needs, further demonstrating the high adaptability and reliability of the equipment combination in complex engineering scenarios.

A triumphant march through the harsh winter! SEMW's soft soil treatment equipment sets off for Singapore


Post time: Dec-30-2025