8613564568558

Short Lead Time for Piling Augers Manufacturer - DAG Steel Column Implant Device – Engineering Machinery

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate inside our success for Vibratory Hammer For Vinyl Sheet Piling, Pile Driving Equipment Manufacturer, Pile Hammers Supplier, "Change for the better!" is our slogan, which means "A better world is before us, so let's enjoy it!" Change for the better! Are you ready?
Short Lead Time for Piling Augers Manufacturer - DAG Steel Column Implant Device – Engineering Machinery Detail:

DAG series steel column implantation equipment is a new type of steel column construction equipment, which is mainly used for deep excavation, soft ground excavation and construction close to buildings. DAG series steel column implantation equipment is equipped with two sets of wedge-shaped hydraulic clamping device and high precision vertical control system, which can not only im;lant steel column into concrete before initial setting, but also plant steel column before pouring concrete. One equipment can easily arrange two kinds of steel column construction technology, which solves the shortcomings of traditional steel column construction supporting equipment, low precision, high cost, slow efficiency and so on.

 

MAIN FEATURES

  • The main machine is light in weight and has lower requirements for supporting cranes.
  • Wedge-block clamping, the main and auxiliary clamping device is the same as the wedge-shaped clamping device made for CNC machine tools, and the coaxial precision is higher.
  • The industry pioneered the technology of three-cylinder pair clamping, and the linkage state is highly synchronous.
  • No auxiliary clamping platform is needed for construction, and the vertical accuracy of steel column implantation is increased by 20%.
  • Electrically driven hydraulic power system, low noise, low energy consumption, environmental protection and economy.
  • With wireless control system, the operator can monitor the whole process of steel column implantation without dead angle in the range of 0-50m.

4 15 16 23 24

 


Product detail pictures:

Short Lead Time for Piling Augers Manufacturer - DAG Steel Column Implant Device – Engineering Machinery detail pictures


Related Product Guide:

We thinks what customers think, the urgency of urgency to act in the interests of a customer position of principle, allowing for better quality, lower processing costs, prices are more reasonable, won the new and old customers the support and affirmation for Short Lead Time for Piling Augers Manufacturer - DAG Steel Column Implant Device – Engineering Machinery, The product will supply to all over the world, such as: Danish, Hungary, Yemen, We believe that good business relationships will lead to mutual benefits and improvement for both parties. We have established long-term and successful cooperative relationships with many customers through their confidence in our customized services and integrity in doing business. We also enjoy a high reputation through our good performance. Better performance will be expected as our principle of integrity. Devotion and Steadiness will remain as ever.
  • The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Jacqueline from Greek - 2018.05.13 17:00
    It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Heloise from Macedonia - 2017.02.18 15:54

    Related Products