SPR 115 Hydraulic Pile Driving Rig

Short Description:

The SEMW SPR115 Hydraulic Pile Driving Rig is a crawler-mounted piling platform designed for building, bridge, port and infrastructure foundation projects. With a 36 m standard leader, hydraulic winch system and stable crawler undercarriage, it supports different pile driving and drilling configurations.

The SPR115 offers a maximum permissible operating weight of 114 t, rated engine power of 191 kW, and compatibility with suitable diesel hammers, hydraulic hammers, vibratory hammers and drilling attachments.


  • FOB Price: US $0.5 - 9,999,999 / Piece
  • Min. Order Quantity: 1 Piece/Pieces
  • Supply Ability: 100 Piece/Pieces per Month
  • Port: Shanghai Port
  • Payment Terms: L/C, D/A, D/P, T/T
  • Product Detail

    Product Tags

    SEMW / FOUNDATION EQUIPMENT / SPR SERIES

    SPR115 Hydraulic Pile Driving Rig

    The SEMW SPR115 is a crawler-mounted hydraulic pile driving rig designed to support pile installation and specialist foundation work with a tall leader, hydraulic winches and a stable undercarriage. The rig can be configured to work with different piling attachments, enabling contractors to match one carrier platform to the selected foundation construction method.

    Its standard 36 m leader, 114 t maximum permissible operating weight and 2.7 r/min slewing speed provide defined reference points for preliminary equipment selection and site planning.

    36 mStandard leader length
    114 tMaximum operating weight
    191 kWRated engine power
    40.1 tBase machine weight

    Product Overview

    Designed as a versatile leader-mounted piling platform, the SPR115 brings together an adjustable piling arrangement, crawler mobility and controlled hoisting for foundation projects requiring precise handling of piling tools and accessories.

    Stable Crawler Foundation

    The crawler undercarriage provides a wide ground-contact footprint for supporting the tall leader and associated equipment. Travel routes, working-platform strength and ground bearing capacity must be reviewed before mobilization.

    Controlled Hoisting & Slewing

    Independent winch functions support positioning and handling operations. The 2.7 r/min slewing specification helps engineering teams assess movement and working-area requirements.

    Multi-Attachment Capability

    The SPR115 platform is designed for configurations including diesel pile hammers, hydraulic hammers, hydraulic vibratory hammers and compatible drilling attachments, subject to configuration engineering.

    Design Features for Foundation Work

    Leader and Rig Support

    The tall leader guides attached piling equipment during construction. Stabilizing struts, hydraulic functions and the undercarriage work together to support controlled alignment and operation.

    Winch System

    Main, auxiliary and third-drum winch functions provide lifting and lowering capability for rig operations. Speed selection supports different handling requirements during setup and piling.

    Operator Control & Monitoring

    A centralized operating arrangement supports movement and hydraulic functions, with safety and condition-monitoring equipment incorporated according to the supplied configuration.

    Configuration Planning

    Selection involves more than leader height: the attachment weight, pile dimensions, soil profile, hoisting requirements and available working space all affect the final rig arrangement.

    SPR115 Technical Specifications

    Key machine specifications for preliminary planning and comparison:

    Technical Item SPR115
    Main / auxiliary / third winch – hoisting, low 30 (2.3) m/min
    Main / auxiliary / third winch – hoisting, high 60 (4.6) m/min
    Main / auxiliary / third winch – lowering, low 30 (2.3) m/min
    Main / auxiliary / third winch – lowering, high 60 (4.6) m/min
    Leader winch – hoisting / lowering 49 (3.7) / 49 (3.7) m/min
    Slewing speed 2.7 r/min
    Travel speed 1.0 (0.07) km/h
    Gradeability, base machine only 40% (21.8°)
    Base machine weight 40.1 t
    Counterweight 16.5 t
    Standard leader length 36 m
    Maximum permissible operating weight 114 t
    Ground contact area 74,560 cm²
    Average ground pressure at maximum operating weight 158 kPa
    Engine brands / options Fiat / Volvo / Cummins
    Rated engine power 191 kW
    Engine maximum torque 1,160 N·m at 1,500 rpm
    Battery 24 V, 200 Ah × 2
    Fuel tank 250 L
    Winch-speed values in parentheses indicate minimum values when fitted with slow-speed control. Values marked as load-dependent are nominal and may vary with working conditions. Final engine selection, emission configuration, dimensions and attachment compatibility should be confirmed for the equipment supplied.

    Compatible Piling Configurations & Applications

    The SPR115 serves as a carrier and leader platform for several types of foundation construction equipment. The attachment and drilling system should be engineered as a complete working configuration.

    Diesel Hammer Pile Driving

    Leader-mounted pile driving arrangements for compatible prefabricated piles, with the pile type, hammer energy, lifting capacity and ground conditions considered in equipment selection.

    Hydraulic Hammer Installation

    Configured with a compatible hydraulic impact hammer for foundation pile installation where the jobsite calls for controlled hammer operation.

    Hydraulic Vibratory Hammer Work

    Supporting a hydraulic vibratory hammer arrangement for selected sheet-pile or pile-driving tasks, subject to vibration response and the project soil profile.

    Auger / Dual-Power Drilling

    Configured for compatible auger or dual-power drilling systems to serve drilling and foundation preparation requirements, with working diameter and depth determined by the matched tool configuration.

    Building FoundationsBridge FoundationsPort & Marine WorksInfrastructure Construction

    Equipment Selection: What to Check Before Ordering

    To determine a suitable SPR115 configuration, the technical team should review these three groups of information together.

    Define the Pile & Tool

    Pile type, cross-section, length, mass and the required diesel, hydraulic, vibratory or drilling attachment.

    Review the Ground & Site

    Geotechnical conditions, construction platform bearing capacity, working headroom, site access and nearby structures.

    Match the Rig & Workflow

    Leader arrangement, lifting requirements, power and hydraulic interface, transportation and erection sequence.

    SPR115 overall dimensions and crawler structure engineering drawing
    SPR115 rig general arrangement and crawler chassis dimensional drawingsMachine layout and component reference for planning equipment transport, installation and working clearances.
    SPR115 machine body front and side dimensional drawings
    SPR115 machine side and front dimensional viewsMachine layout and component reference for planning equipment transport, installation and working clearances.
    SPR115 crawler track dimensions and dimensions in millimeters
    SPR115 crawler track dimensional drawingMachine layout and component reference for planning equipment transport, installation and working clearances.
    SPR115 counterweight layout and component dimensions
    SPR115 counterweight configuration drawingsMachine layout and component reference for planning equipment transport, installation and working clearances.
    SEMW SPR115 piling rig with a red hammer mounted along the leader at a construction site
    SPR115 with piling hammer attachment on site
    SEMW SPR115 hydraulic pile driving rig with tall leader at an outdoor foundation worksite
    SPR115 full-height leader and crawler rig at a construction site
    SEMW SPR115 piling rig operating with a red pile driving attachment
    SPR115 pile driving equipment and red attachment in the field
    SEMW SPR115 crawler pile driving rig with blue piling attachment at a construction site
    SPR115 tracked piling rig with blue front-mounted attachment

    Frequently Asked Questions

    What is the standard leader length of the SPR115?

    The specified standard leader length is 36 m. The supplied configuration and attachment arrangement should be checked against required pile length and working height.

    Which pile driving attachments can be used with the SPR115?

    The rig supports engineered configurations with diesel pile hammers, hydraulic hammers, hydraulic vibratory hammers and compatible drilling attachments. Exact combinations depend on equipment interface and capacity checks.

    Is the SPR115 suitable for bridge and port foundations?

    It can be considered for piling operations in infrastructure, bridge and port projects when the required attachment, ground conditions and site access match its working configuration.

    What operating data should be checked for site planning?

    Key considerations include permissible working weight, leader length, winch speeds, slewing speed, ground contact area, ground pressure and travel access.

    How does SPR115 differ from larger SPR series rigs?

    Leader arrangement, operating weight, hoisting capacity, crawler geometry and optional equipment vary across the SPR family. Compare the exact configuration and intended attachment rather than selecting a rig by model name alone.

    Talk to SEMW About Your Piling Requirements

    Share your pile dimensions, geological information, preferred piling attachment and jobsite layout to discuss a suitable SPR115 working configuration with Shanghai Engineering Machinery Co., Ltd.

    Email: sales@semw.com   |   Visit SEMW


  • Previous:
  • Next:

  • Related Products